Operational message from IBEX

Dear Colleagues,

The TEL (RO) – ESO (BG) Interconnector WILL BE CLOSED on 15.02.2024 10:50 CET due to system maintenance. No capacity allocation will be possible. Another message will be sent before re-opening.