Operational message from IBEX – (XBID_TSO_02): XBID (Re)Opening of Interconnectors

Dear all,

 The technical maintenance is over.

The TEL (RO) – ESO (BG)  Interconnector will be (re) opened.

 

Kind regards,
The IBEX Team