Dear Colleagues,
The maintenance was finished.
The MAVIR (HU) – TRANSELECTRICA (RO), MAVIR (HU) – ELES (SI), MAVIR (HU) – SEPS (SK) and MAVIR (HU) – HOPS (HR) interconnectors were reopened at 16.05.2024 14:40 CET.
The maintenance was finished.
The MAVIR (HU) – TRANSELECTRICA (RO), MAVIR (HU) – ELES (SI), MAVIR (HU) – SEPS (SK) and MAVIR (HU) – HOPS (HR) interconnectors were reopened at 16.05.2024 14:40 CET.